From the takeoff to the proposal, one line of math.
Change something in the takeoff and send it again, and every line it touches moves. A bid you already sent keeps its math.
Drop in the quote. The bid math fills itself.
A PDF, a screenshot, a phone photo or the email itself. Bid Terminal reads each line, matches it to your conditions, and fills in the price, the box size and the unit. Then it figures the labor from your rates. Every filled number has a Show me back to the line on the quote.
| 2x2 ACT tile, 16 pc/box | $58.40 /box |
| 12' main tee | $9.85 ea |
| 4' cross tee | $1.10 ea |
| 10' wall angle | $3.20 ea |
| Freight | $185.00 |
| Line | Qty | Price | Total |
|---|
Sample quote and sample numbers. Your rates and crew sizes replace ours.
Every number shows its steps.
This is how a tile card turns the takeoff into a price. Change any input and every step updates. In the app, each step has a Show me to where its number came from.
Ceiling tile ACT-1 · How it's figured (sample numbers)
Set it up the way your shop buys and installs.
Formula steps on each card Live
Write it the way you'd say it: SF ÷ 4 up ÷ BOX up × BOX × 4. Each card keeps its own steps.
Rounding at each step Live
Up, down or nearest. 21.1 boxes rounds up to 22, and an exact 21 stays 21.
What's in a box Live
Pieces, SF, LF, EA or SY. Change the unit in one place and the math follows.
Waste at every level Live
Company, job, line, or the Takeoff condition. Waste is never counted twice.
Labor rates Live
Per card, in pieces or units an hour. A job that runs slow gets a rate that's only for this job.
Tax and markup Live
Tax, freight, overhead, profit, insurance and bond, in the order you set.
Preset packages Live
Ready-made material and labor setups for common systems. Adjust them to your shop.
Excel-style formula box Live
Type-ahead, an Insert list, and ROUNDUP, CEILING, IF, MIN, MAX and more, with a live check under the box.
Cards made from conditions Live
A new size read from the plans saves its own material and labor card, ready to price.
Each trade gets its own math.
Built in, each with its own test. Live
Drywall
Hangs the boards for fewest butt joints, with layers per side, studs, track, corner bead and control joint.
Painting
One side or both, primer, and wall SF from the wall height.
Acoustical ceilings
Tiles, mains, cross tees, wall angle and hangers, with lights on the grid.
Flooring and tile
By finish tag, with base, cove, toe-kick base, patterns and whole tiles.
Wallcovering
Rolls from the wall height and roll width.
Doors, frames and hardware
Hardware per opening and per leaf, pairs, cased openings and ratings.
Masonry
CMU, modular, queen or king brick, mortar, grout, rebar and ties.
Roofing
Membrane, shingles in squares, flashing, edge metal and tear-off.
Steel and deck
Weight from the shape, connections and deck squares.
Insulation, firestop, waterproofing, EIFS, plaster, framing, concrete, earthwork, MEP
Each with its own conditions and math.
31 checks on the math, every trade.
They run on every bid before you send. See all the checks
31Price and math
From waste counted twice to a $0 price
Price and math
From waste counted twice to a $0 price
- Waste % assumed
- Freight is a % with no quote giving it
- Prices or rates older than N months
- Price per SF more than 20% off your recent bids
- Bid Log total doesn't match the estimate
- Alternates or unit prices to check
- Numbers you typed instead of the app's
- Prices that look like placeholders
- Materials with no price, SAMPLE rates, items added with no amount
- Piece length not set
- An option group's pick has no price or count
- Box in SF but the formula counts tiles
- A material's count missing or looks wrong
- An item names a material that counts nothing
- A material counts nothing, so it isn't priced (with its dollars)
- A main material counts nothing though the takeoff has area for it
- Labor lines with no hours
- A $0.00 price
- Bond on with no rate
- Second check: every line worked out again from scratch gives a different number
- Waste counted twice
- Crew days: hours a day or crew size blank
- A formula step cuts the count
- One line covers several types: same or different?
- A labor line skips items
- Labor hours don't match count ÷ speed, or boxes don't match
- Is a labor rate pieces an hour or units an hour?
- Mileage has no $ a mile
- Phased work: a trip for each phase?
- A labor % applies to all the labor, not just one wall type
- A material has no labor line that installs it